Audit
Audit checklist / items
| # | Type | Requirement | Item | Result | Finding | |
No checklist items yet.
Findings from this audit
| Ref | Level | Description | Status | Risk | |
No findings recorded for this audit.
Finding
Resolution (corrective action)
Risk assessment (ICAO / EASA 5x5)
Click a cell: rows = probability (5 Frequent ... 1 Extremely improbable), columns = severity (A Catastrophic ... E Negligible).
No risk selected.
Risk
Initial risk assessment (ICAO / EASA 5x5)
Risk before / with existing controls. Rows = probability (5..1), columns = severity (A..E).
No risk selected.
Risk treatment / mitigation
Residual risk assessment (after mitigation)
No risk selected.
Status, review & acceptance
KORA
Key Operational Risk Area
Assessed risk (ICAO / EASA 5x5)
No risk selected.
Safety performance (SPI / SPT)
KPI
Key Performance Indicator (occurrences)
Result
Save the KPI, then link occurrences below.